Raw material used is as per customer specification and either on job-work basis or self Purchased.Processes involved in manufacturing of Aluminium Roll Bond Evaporator Panel are as follows :
1.
Sheet Cutting
2.
Brushing
3.
Sheet Annealing
4.
Bonding
5.
Rerolling
6.
Annealing
7.
Flattening
8.
Mouth Opening
9.
Inflating
10.
Cutting and stamping
11.
Pressing Operation
12.
Flushing
13.
Tube Preparation and Tig welding
14.
Leak Test before Powder Coating
15.
Surface Preparation and Coating
16.
Leak Test after Powder Coating
17.
Final Inspection
18.
Dry Nitrogen Flushing
19.
Packing
 
     

1.
Sheet Cutting  
  In the first process, i.e. sheet cutting the raw material Al sheets are cut to required sizes in specific parameters, which differs cutomerwise and modelwise.
 
2.
Brushing  
    After Sheet cutting the sheet surface is brushed, to prepare surface for adhesion. Parameters for strength, temperaure and Concentration are maintained to control the process.
 
3.
Sheet Annealing  
    Sheets are then annealed at specific temperature to acquire required softness.
 
4.
Bonding  
  The annealed sheets are then Bonded together with circuit on inner side.  
 
5.
Rerolling  
 
The Roll Bond panels are then rerolled to increase the circuit length.
 
6.
Annealing  
  To achieve required hardness, the rerolled panels are then annealed at specific temperature.
 
7.
Flattening  
    Annealed panels are then flattened.
 
8.
Mouth Opening  
  Mouth opening operation is done to expose inlet and outlet of internal circuit, so as to make the panel ready for inflating.  
 
9.
Inflating  
    Inflating operation involved flushing of high pressure dry air inside the panel through inlet, so that the circuit gets inflated to required sixe. This opearation is carried out in a special Inflating press.

10.
Cutting and stamping  
  After Inflating, panels are sixe cut to get required length and width and batch no. is stamped for identification.  
 
11.
Pressing Operation  
    Pressing operation is then carried out as per the customer requirement.
 
12.
Flushing  
  Panels are then flushed with dry air at a specific pressure.  
 
13.
Tube Preparation and Tig welding
 
Tube preparatin involves manufactuing of tube joint. Chanvim maunfactures two types of joints for Roll Bond Evaporator panels :

A. Butt joint
B. Special epoxy joint.

These joints are leak tested at a 250 psi.
 
14.
Leak Test beforE Powder Coating  
  These joints have Copper and Aluminium tube, either Butt welded as in A, or, joined with special epoxy glue as in B. These joins vary model and pary wise from single two double, customer wise and named as single entry or double entry respectively. In single entry joints, Cu capillary is brazed with Cu – Al tube joint.  
 
15.
Surface Preparation and Coating
    After manufactuing sub-assembly,they are Tig welded with bare panel so as to make a complete Roll Bond Evaporator panel with Assembly.
 
16.
Leak Test after Powder Coating  
  This panel is leak tested before Surface preparation and Powder coating at 125 psi.  
 
17.
Final Inspection
    The panels then undergo surface preparation and powder coating operation.
 
18.
Dry Nitrogen Flushing  
  Powder coated panels are again leak tested and sent for final inspection and subsequently for packing.Panels are packed in special corrugated paper boxes and despatched to customer with the elute to ensure a proper cusion for tubes.  
 
19.
Packing
    Powder coated panels are again leak tested and sent for final inspection and subsequently for packing.Panels are packed in special corrugated paper boxes and despatched to customer.
   